Project case · 40

Distribution room upgrade for a pump factory

A domestic pump-factory distribution-room upgrade with on-site meter installation coordination and power-on completion.

China
Technician working on GGD distribution panels in a pump factory
On-site work in the upgraded distribution room

Project overview

Distribution room upgrade for a pump factory

This domestic project upgraded the distribution room of a pump factory.

ELCZEEN provided on-site service and coordinated with the local power-supply bureau for meter installation before completing the power-on work.

Project at a glance

Equipment and delivery scope

Key application, configuration and delivery details for this project.

Application
Pump factory
Project type
Distribution-room upgrade
Site work
Meter installation coordination
Completion step
Power-on work

Project gallery

Project equipment and site photos

View 4 photos of the equipment, drawings and site work.

Technician working on GGD distribution panels in a pump factory
01On-site work in the upgraded distribution room
Pump factory distribution room upgrade equipment
02Distribution-room equipment
Meter installation work in the pump factory distribution room
03Meter installation and site coordination
Completed pump factory power distribution room
04Completed power-on work

Project planning

Planning a similar power-distribution project?

Send your equipment specificationSingle-line diagram, equipment schedule, electrical ratings and installation details.

Zeen Electric can discuss switchgear, panels or substations for a comparable application when you provide the system voltage, load, protection and site requirements.

Send project requirements

Planning a similar switchgear, panel or transformer project?

Send project requirements

Tell us what you need

Fill in your requirements, then send the prepared inquiry to our team through WhatsApp.